To configure the schedule of synchronization with the Active Directory domain controller:
For example, if the values are set to Mon and 15:00, the synchronization runs every Monday at 3 p.m.
For example, if the values are set to 20 and 15:00, the synchronization runs on the 20th day of the month at 15:00.
If the specified value exceeds the number of days in a given month, the synchronization in that month will take place on the last day. For example, if the value is 31, in 30-day months, the synchronization will take place on the 30th of the month.
For example, if the frequency value is 30 and Minutes frequency is selected, the synchronization is run every half hour.
The first synchronization starts immediately after the changes are saved.
By default, synchronization runs every 30 minutes.
The schedule of data synchronization with the domain controller is configured.
The current status of synchronization with Active Directory is displayed in the Nodes section when you view cluster node information.
Page top