While the System Integrity Check (ODFIM) task is running, each object change is determined by comparing the current state of the monitored objects with its original state, which was previously established as a baseline.
To use the task, a license that includes the corresponding function is required.
This feature is not supported in the KESL container.
The system baseline is created during the first run of the ODFIM task on the device. You can create several ODFIM tasks. For each ODFIM task, a separate baseline is created. The task is performed only if the baseline corresponds to the monitoring scope. If the baseline does not match the monitoring scope, Kaspersky Endpoint Security generates a system integrity violation event.
The baseline is rebuilt after an ODFIM task has finished. You can rebuild a baseline for a task using the corresponding setting. Also, a baseline is rebuilt when the settings of a task change, for example, if a new monitoring scope is added. The baseline will be rebuilt during the next task run. You can delete a baseline by deleting the corresponding ODFIM task.
Page top