In the asset tree, select the markup whose chart you want to view.
A list of options appears on the right.
Click the On graph button.
A panel with the markup chart appears on the right.
Select the relevant preset from the Preset drop-down list.
If necessary, in the Markups field, select the markups for displaying data intervals.
If you need to select a date and time for displaying the data, do one of the following:
In the Graph center field, select the date and time for which you want to display data in the chart.
The vertical black dotted line will indicate the selected date and time (in the center of the chart).
Click the New graph center icon (), which is located to the left of the time axis, and select the necessary point on the time axis.
The selected point will become the new center of the graph. The vertical black dashed line will indicate the new date and time.
If you need to select a time interval for displaying data on the chart, do one of the following:
If you need to display data for a fixed time interval, select the relevant time interval from the Scale drop-down list. The following time intervals are available by default:
To display data for a custom time interval, click the New interval () icon to the left of the time axis, select the required interval on the time axis, and click the Apply button. If you need to change the scale again, repeat this step.
The chart will show the data intervals in the colors specified for the selected markups.