When you create a task, it uses the time zone of the virtual machine on which the orchestrator is deployed. For example, if you schedule a script to run on a CPE device at 2:00 p.m., the script runs at 2:00 p.m. in the time zone of the orchestrator, even if the time on the CPE device is 6:00 p.m.
We recommend taking into account the following special considerations when managing tasks:
A 10-second inaccuracy is considered acceptable for the moment when the task is run.
If multiple tasks exist, they run simultaneously. If the orchestrator cannot run all tasks simultaneously, they are run in the order they were created.
When deleting a script associated with tasks, this action requires additional confirmation. If you confirm the action, the script is deleted and cannot be run within the created tasks.